KSC-00PP-1120.jpg KSC-00PP-1119SīkbildesKSC-00PP-1117KSC-00PP-1119SīkbildesKSC-00PP-1117
Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
Information
Taken in
Kennedy Space Center
Autors
NASA
Apraksts
Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Apmeklējumi
38
Location
Skatīt uz OpenStreetMap
Rezultējošais vērtējums
nav vērtējuma
Vērtēt šo foto
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Lejupielādes
0