KSC-00PP-1117.jpg KSC-00PP-1116MiniatyrbilderKSC-00PP-1118KSC-00PP-1116MiniatyrbilderKSC-00PP-1118
The payload canister is hoisted up alongside the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be moved into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS- 106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Information
Taken in
Kennedy Space Center
Forfatter
NASA
Beskrivelse
The payload canister is hoisted up alongside the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be moved into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS- 106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Opprettet den
Fredag 11 August 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Besøk
36
Location
Vis på OpenStreetMap
Vurdering poengsum
ingen vurdering
Vurder dette bildet
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Nedlastinger
0