KSC-00PP-1093.jpg KSC-00PP-1092DiapositibakKSC-00PP-1094KSC-00PP-1092DiapositibakKSC-00PP-1094
In the Space Station Processing Facility, an overhead crane moves the P4 truss to a workstand. Part of the 10-truss, girder-like structure that will ultimately extend the length of a football field on the International Space Station, the P4 is the second port truss segment that will attach to the first port truss segment (P1 truss). The P4 is scheduled for mission 12A in September 2002.
Information
Taken in
Kennedy Space Center
Egilea
NASA
Azalpena
In the Space Station Processing Facility, an overhead crane moves the P4 truss to a workstand. Part of the 10-truss, girder-like structure that will ultimately extend the length of a football field on the International Space Station, the P4 is the second port truss segment that will attach to the first port truss segment (P1 truss). The P4 is scheduled for mission 12A in September 2002.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Bisitak
37
Location
View on OpenStreetMap
Kalifikazioa
baloratu gabe
Balioestea
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Deskargak
1