KSC-00PP-1119.jpg KSC-00PP-1126MiniatyrerKSC-00PP-1120KSC-00PP-1126MiniatyrerKSC-00PP-1120
Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, inches its way to Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
Information
Taken in
Kennedy Space Center
Fotograf
NASA
Beskrivning
Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, inches its way to Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Besök
35
Location
Visa i OpenStreetMap
Röstpoäng
inget betyg
Betygsätt den här bilden
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Nerladdningar
0