KSC-00PP-1116.jpg KSC-00PP-1108ThumbnailsKSC-00PP-1117KSC-00PP-1108ThumbnailsKSC-00PP-1117
The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS- 106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Information
Taken in
Kennedy Space Center
Author
NASA
Description
The payload canister arrives at the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be lifted up into the Payload Changeout Room near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS- 106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Visits
35
Location
View on OpenStreetMap
Rating score
no rating
Rate this photo
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0