In the Space Station Processing Facility, an overhead crane lowers the cover from the SPACEHAB module (at left) onto the floor. The module, part of the payload on mission STS-106, will be placed in the payload canister for transport to the launch pad. STS-106 is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Information
Taken in
Kennedy Space Center
作成者
NASA
説明
In the Space Station Processing Facility, an overhead crane lowers the cover from the SPACEHAB module (at left) onto the floor. The module, part of the payload on mission STS-106, will be placed in the payload canister for transport to the launch pad. STS-106 is scheduled to launch Sept. 8 at 8:31 a.m. EDT.