KSC-00PP-1118.jpg KSC-00PP-1119VorschaubilderKSC-00PP-1117KSC-00PP-1119VorschaubilderKSC-00PP-1117
With umbilical lines still attached, the payload canister is hoisted up alongside the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be moved into the Payload Changeout Room (PCR) near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Information
Taken in
Kennedy Space Center
Autor
NASA
Beschreibung
With umbilical lines still attached, the payload canister is hoisted up alongside the Rotating Service Structure (RSS) on Launch Pad 39B. The canister with its cargo of the SPACEHAB module and Integrated Cargo Carrier will be moved into the Payload Changeout Room (PCR) near the top of the RSS for transfer to the payload bay of Shuttle Atlantis for mission STS-106. The PCR provides an environmentally controlled facility for the transfer. The 11-day mission to the International Space Station will include service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew. Atlantis is scheduled to launch Sept. 8 at 8:31 a.m. EDT.
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Besuche
36
Location
In OpenStreetMap ansehen
Bewertung
noch keine Bewertung
Foto bewerten
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
1