KSC-20190628-PH-FWM01-0224.jpg KSC-20190627-PH-JBS01-0158缩略图KSC-20190628-PH-JBS01-0025KSC-20190627-PH-JBS01-0158缩略图KSC-20190628-PH-JBS01-0025
A close-up aerial view of Launch Complex 39B with Exploration Ground Systems’ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASA’s Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agency’s Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1
Information
Taken in
Kennedy Space Center
作者
NASA/Frank Michaux
描述
A close-up aerial view of Launch Complex 39B with Exploration Ground Systems’ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASA’s Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agency’s Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
访问量
35
Location
在 OpenStreetMap 查看
评价得分
没有评分
评分
License
Public Domain
Modified by WikiArchives
No (original)
下载
3
EXIF 元数据
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2019:06:28 12:07:14
ApertureFNumber
f/2.8