KSC-20180830-PH-CNS02-0001.jpg KSC-20171016-PH-KLS01-0088الصور المصغرةKSC-20180831-PH-JBP01-0003KSC-20171016-PH-KLS01-0088الصور المصغرةKSC-20180831-PH-JBP01-0003
NASA's mobile launcher (ML) atop crawler-transporter 2 begins its trek to Launch Pad 39B on Aug. 30, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check on the surface of the pad, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
Information
Taken in
Kennedy Space Center
author
الوصف
NASA's mobile launcher (ML) atop crawler-transporter 2 begins its trek to Launch Pad 39B on Aug. 30, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check on the surface of the pad, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
تاريخ الصورة
الخميس 30 أغسطس 2018
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
الزوار
27
Location
View on OpenStreetMap
حسب معدل التقييم
كن أول من يعطي تقيمه لهذه الصورة
قيم هذه الصورة
License
Public Domain
Modified by WikiArchives
No (original)
تنزيل
0
البيانات الوصفية EXIF
Apple iPhone 7 Plus
Make
Apple
Model
iPhone 7 Plus
DateTimeOriginal
2018:08:30 13:27:31
ApertureFNumber
f/2.8