KSC-20190628-PH-FWM01-0069.jpg KSC-20190628-PH-FWM01-0106EsikatselukuvatKSC-20190628-PH-FWM01-0032KSC-20190628-PH-FWM01-0106EsikatselukuvatKSC-20190628-PH-FWM01-0032
An aerial view of Launch Complex 39B with Exploration Ground Systemsâ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASAâs Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agencyâs Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1.
Information
Taken in
Kennedy Space Center
Tekijä
NASA/Frank Michaux
Kuvaus
An aerial view of Launch Complex 39B with Exploration Ground Systemsâ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASAâs Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agencyâs Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1.
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Vierailut
32
Location
View on OpenStreetMap
Pisteet
ei arvosteltu
Arvostele tämä kuva
License
Public Domain
Modified by WikiArchives
No (original)
Lataukset
1
EXIF Metatiedot
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2019:06:28 12:04:02
ApertureFNumber
f/2.8