KSC-20180831-PH-CHS01-0106.jpg KSC-20180831-PH-CHS01-0016サムネイルKSC-20180907-PH-CHS01-0004KSC-20180831-PH-CHS01-0016サムネイルKSC-20180907-PH-CHS01-0004
With a view of the flame trench and flame deflector below, NASA's mobile launcher (ML) atop crawler-transporter 2 arrives at Launch Pad 39B on Aug. 31, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
Information
Taken in
Kennedy Space Center
作成者
NASA/Cory Huston
説明
With a view of the flame trench and flame deflector below, NASA's mobile launcher (ML) atop crawler-transporter 2 arrives at Launch Pad 39B on Aug. 31, 2018, at the agency's Kennedy Space Center in Florida. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
作成日時
金曜日 31 8月 2018
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
訪問
28
Location
View on OpenStreetMap
評価点
評価なし
この写真を評する
License
Public Domain
Modified by WikiArchives
No (original)
ダウンロード
0
EXIF メタデータ
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2018:08:31 14:14:25
ApertureFNumber
f/11.0