KSC-20180831-PH-CHS01-0096.jpg KSC-20180831-PH-CHS01-0095МиниатюриKSC-20180831-PH-CHS01-0098KSC-20180831-PH-CHS01-0095МиниатюриKSC-20180831-PH-CHS01-0098
The crawler-transporter 2, with NASA's mobile launcher atop, makes its way up the ramp to the top of Launch Pad 39B at NASA's Kennedy Space Center in Florida, on Aug. 31, 2018. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
Information
Taken in
Kennedy Space Center
Автор
NASA/Cory Huston
Описание
The crawler-transporter 2, with NASA's mobile launcher atop, makes its way up the ramp to the top of Launch Pad 39B at NASA's Kennedy Space Center in Florida, on Aug. 31, 2018. The ML will undergo a fit check, followed by several days of systems testing. The 380-foot-tall mobile launcher is equipped with the crew access arm and several umbilicals that will provide power, environmental control, pneumatics, communication and electrical connections to NASA's Space Launch System (SLS) and Orion spacecraft. Exploration Ground Systems is preparing the ground systems necessary to launch SLS and Orion on Exploration Mission-1, missions to the Moon and on to Mars.
Създаден на
петък 31 август 2018
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Посещения
26
Location
Виж в OpenStreetMap
Рейтинг
няма оценка
Оцени тази снимка
License
Public Domain
Modified by WikiArchives
No (original)
Сваляния
0
EXIF метаданни
Canon Canon EOS 6D Mark II
Make
Canon
Model
Canon EOS 6D Mark II
DateTimeOriginal
2018:08:31 13:45:23
ApertureFNumber
f/10.0