KSC-20190628-PH-FWM01-0206.jpg KSC-20190627-PH-JBS01-0140ಕಿರುಚಿತ್ರಗಳುKSC-20190628-PH-JBS01-0016KSC-20190627-PH-JBS01-0140ಕಿರುಚಿತ್ರಗಳುKSC-20190628-PH-JBS01-0016
A close-up aerial view of Launch Complex 39B with Exploration Ground Systems’ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASA’s Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agency’s Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1.
Information
Taken in
Kennedy Space Center
ಲೇಖಕ
NASA/Frank Michaux
ವಿವರಗಳು
A close-up aerial view of Launch Complex 39B with Exploration Ground Systems’ mobile launcher for the Artemis 1 mission on the pad. The mobile launcher, atop crawler-transporter 2, made its final solo trek from the Vehicle Assembly Building on June 27, 2019, and arrived on the surface of pad B on June 28, 2019, at NASA’s Kennedy Space Center in Florida. The mobile launcher will remain at the pad over the summer, undergoing final testing and checkouts. Its next roll to the pad will be with the agency’s Space Launch System rocket and Orion spacecraft in preparation for the launch of Artemis 1.
ರಂದು ರಚಿಸಲಾಗಿದೆ
ಶುಕ್ರವಾರ 28 ಜೂನ್ 2019
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
ಭೇಟಿಗಳು
32
Location
View on OpenStreetMap
ಗುಣದರ್ಜೆಯ ಅಂಕ
ಯಾವುದೇ ಗುಣದರ್ಜೆ ಇಲ್ಲ
ಈ ಚಿತ್ರದ ಗುಣದರ್ಜೆಯನ್ನು ಹೊಂದಿಸಿ
License
Public Domain
Modified by WikiArchives
No (original)
ವರ್ಗಾವಣೆಗಳು
1
EXIF ವಿವರಗಳು
Canon Canon EOS 5D Mark IV
Make
Canon
Model
Canon EOS 5D Mark IV
DateTimeOriginal
2019:06:28 12:06:59
ApertureFNumber
f/2.8