KSC-20161019-PH-JBS01-0027.jpg KSC-20161019-PH-JBS01-0024МиниатюриKSC-20161019-PH-JBS01-0053KSC-20161019-PH-JBS01-0024МиниатюриKSC-20161019-PH-JBS01-0053
Testing of the Orion Service Module Umbilical (OSMU) was completed at the Launch Equipment Test Facility at NASA's Kennedy Space Center in Florida. The OSMU was attached to Vehicle Motion Simulator 1 for a series of simulated launch tests to validate it for installation on the mobile launcher. The test team gathered for an event to mark the end of testing. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. Kennedy's Engineering Directorate is providing support to the Ground Systems Development and Operations Program for testing of the OSMU. EM-1 is scheduled to launch in 2018.
Information
Taken in
Kennedy Space Center
Автор
NASA/Ben Smegelsky
Описание
Testing of the Orion Service Module Umbilical (OSMU) was completed at the Launch Equipment Test Facility at NASA's Kennedy Space Center in Florida. The OSMU was attached to Vehicle Motion Simulator 1 for a series of simulated launch tests to validate it for installation on the mobile launcher. The test team gathered for an event to mark the end of testing. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. Kennedy's Engineering Directorate is providing support to the Ground Systems Development and Operations Program for testing of the OSMU. EM-1 is scheduled to launch in 2018.
Създаден на
сряда 19 октомври 2016
Source link
https://www.flickr.com/photos/nasakennedy/albums/72157664052441771
Посещения
34
Location
Виж в OpenStreetMap
Рейтинг
няма оценка
Оцени тази снимка
License
Public Domain
Modified by WikiArchives
No (original)
Сваляния
1
EXIF метаданни
Canon Canon EOS 5D Mark III
Make
Canon
Model
Canon EOS 5D Mark III
DateTimeOriginal
2016:10:19 11:24:39
ApertureFNumber
f/4.5