KSC-00PP-0207.jpg KSC-00PP-0206MiniaturebillederKSC-99PP-0658KSC-00PP-0206MiniaturebillederKSC-99PP-0658
In the Operations and Checkout Building, a smiling STS-99 Mission Specialist Janet Kavandi waves after donning her launch and entry suit during final launch preparations. In background is a suit technician. STS-99, known as the Shuttle Radar Topography Mission (SRTM), is scheduled for liftoff at 12:30 p.m. EST from Launch Pad 39A. The SRTM will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. The mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour.
Information
Taken in
Kennedy Space Center
Forfatter
NASA
Beskrivelse
In the Operations and Checkout Building, a smiling STS-99 Mission Specialist Janet Kavandi waves after donning her launch and entry suit during final launch preparations. In background is a suit technician. STS-99, known as the Shuttle Radar Topography Mission (SRTM), is scheduled for liftoff at 12:30 p.m. EST from Launch Pad 39A. The SRTM will chart a new course to produce unrivaled 3-D images of the Earth's surface. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. The mission is expected to last 11days, with Endeavour landing at KSC Tuesday, Feb. 22, at 4:36 p.m. EST. This is the 97th Shuttle flight and 14th for Shuttle Endeavour.
Oprettet den
Fredag 11 Februar 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Besøg
40
Location
Vis i OpenStreetMap
Bedømmelse
ingen bedømmelse
Bedøm dette fotografi
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0