KSC-00PP-0482.jpg KSC-00PP-0523VirschäibillerKSC-00PP-0481KSC-00PP-0523VirschäibillerKSC-00PP-0481
Seated in a slidewire basket at the 195-foot level of the Fixed Service Structure, Launch Pad 39A, are (left to right) STS-101 Commander James D. Halsell Jr. and Pilot Scott J. "Doc" Horowitz. Halsell is reaching to pull the release lever that will send the basket shooting down the 1,200-foot slidewire to a bunker west of the launch pad. The crew is practicing emergency egress from the orbiter as part of Terminal Countdown Demonstration (TCDT) activities that include a simulated launch countdown and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight to the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A.
Information
Taken in
Kennedy Space Center
Auteur
NASA
Description
Seated in a slidewire basket at the 195-foot level of the Fixed Service Structure, Launch Pad 39A, are (left to right) STS-101 Commander James D. Halsell Jr. and Pilot Scott J. "Doc" Horowitz. Halsell is reaching to pull the release lever that will send the basket shooting down the 1,200-foot slidewire to a bunker west of the launch pad. The crew is practicing emergency egress from the orbiter as part of Terminal Countdown Demonstration (TCDT) activities that include a simulated launch countdown and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight to the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A.
Erstallt den
Freiden 7 Abrëll 2000
Source link
https://science.ksc.nasa.gov/gallery/photos/2000/
Visitten
36
Location
View on OpenStreetMap
Bewäertungs-Stand
nach keng Bewäertung
Foto bewäerten
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
Downloads
0