KSC-99PP-1057.jpg KSC-99PP-0972缩略图KSC-00PP-0089KSC-99PP-0972缩略图KSC-00PP-0089
In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.
Information
Taken in
Kennedy Space Center
作者
NASA
描述
In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.
Source link
https://science.ksc.nasa.gov/gallery/photos/1999/
访问量
57
Location
在 OpenStreetMap 查看
评价得分
没有评分
评分
License
CC BY-NC-ND
Modified by WikiArchives
No (original)
下载
0