S92-41071.jpg STS052-S-051រូប​គំរប​ផ្ទៃ​លើ​S92-45896STS052-S-051រូប​គំរប​ផ្ទៃ​លើ​S92-45896
In Orbiter Processing Facility High Bay 3, workers continue establishing the mechanical interfaces between the U.S. Microgravity Laboratory (USML-1) and the orbiter Columbia. Electrical connections will be performed next. To left of the laboratory module is the Extended Duration Orbiter pallet. Columbia is targeted for liftoff this summer on the STS-50 mission, the first extended duration flight with a scheduled stay of 13 days.* *Because of inclement weather at the prime landing facility, STS-50 landed one-day later, marking a Shuttle record 14-days in orbit.
Information
Taken in
Kennedy Space Center
ម្ចាស់​រូប​ថត
NASA
ពិពណ៌នា
In Orbiter Processing Facility High Bay 3, workers continue establishing the mechanical interfaces between the U.S. Microgravity Laboratory (USML-1) and the orbiter Columbia. Electrical connections will be performed next. To left of the laboratory module is the Extended Duration Orbiter pallet. Columbia is targeted for liftoff this summer on the STS-50 mission, the first extended duration flight with a scheduled stay of 13 days.* *Because of inclement weather at the prime landing facility, STS-50 landed one-day later, marking a Shuttle record 14-days in orbit.
បាន​បង្កើត​នៅ​​
ថ្ងៃ​អង្គារ 14 ខែ​មេសា 1992
សៀវ​ភៅ​រូប​ថត​ទាំងអស់
US SPACE PROGRAM / SPACE SHUTTLE / MISSIONS / STS-50 / Rocket preparation
Source link
https://images.nasa.gov/search-results?q=sts-50&page=1&media=image,video,audio&yearStart=1991&yearEnd=1992
ចូល​
54
Location
View on OpenStreetMap
ពិន្ទុ​នៃ​ការ​វាយ​តម្លៃ
មិន​មាន​ការ​វាយ​តម្លៃ​
វាយ​តម្លៃ​រូប​ថត​នេះ​
License
Public Domain
Modified by WikiArchives
No (original)
Downloads
0