S96-03751.jpg STS080-S-004ಕಿರುಚಿತ್ರಗಳುSTS062-S-029STS080-S-004ಕಿರುಚಿತ್ರಗಳುSTS062-S-029
The Space Shuttle Orbiter Columbia's (STS-75) mission came to a close as the orbiter touched down on Runway 33 of Kennedy Space Center's Shuttle Landing Facility on March 9, 1996. Off to the right is the Vehicle Assembly Building and the Shuttle Training Aircraft (STA). The Mate/Demate Device (MDM) is at left. This Marshall Space Flight Center managed mission lasted 15 days and 17-hours, during which time the seven member crew conducted microgravity research with the U.S. Microgravity Payload (USMP-3), which flew for the third time. The other primary payload was the Tethered Satellite System (TSS-1R),a reflight from an earlier mission, but the satellite was lost when the tether broke just short of its fully deployed length of nearly 13 miles.
Information
Taken in
Kennedy Space Center
ಲೇಖಕ
NASA
ವಿವರಗಳು
The Space Shuttle Orbiter Columbia's (STS-75) mission came to a close as the orbiter touched down on Runway 33 of Kennedy Space Center's Shuttle Landing Facility on March 9, 1996. Off to the right is the Vehicle Assembly Building and the Shuttle Training Aircraft (STA). The Mate/Demate Device (MDM) is at left. This Marshall Space Flight Center managed mission lasted 15 days and 17-hours, during which time the seven member crew conducted microgravity research with the U.S. Microgravity Payload (USMP-3), which flew for the third time. The other primary payload was the Tethered Satellite System (TSS-1R),a reflight from an earlier mission, but the satellite was lost when the tether broke just short of its fully deployed length of nearly 13 miles.
ರಂದು ರಚಿಸಲಾಗಿದೆ
ಶನಿವಾರ 9 ಮಾರ್ಚ್ 1996
Source link
https://images.nasa.gov/search-results?q=sts-75&page=1&media=image,video,audio&yearStart=1995&yearEnd=1996
ಭೇಟಿಗಳು
39
Location
View on OpenStreetMap
ಗುಣದರ್ಜೆಯ ಅಂಕ
ಯಾವುದೇ ಗುಣದರ್ಜೆ ಇಲ್ಲ
ಈ ಚಿತ್ರದ ಗುಣದರ್ಜೆಯನ್ನು ಹೊಂದಿಸಿ
License
Public Domain
Modified by WikiArchives
No (original)
ವರ್ಗಾವಣೆಗಳು
0